Tricotage au Takeyama
{{ '2019-02-06' | amDateFormat:"dddd Do MMMM YYYY" }}

Tricotage au Takeyama
{{ '2019-02-06' | amDateFormat:"dddd Do MMMM YYYY" }}

Elevation profile

Application mobile

View and save your outputs directly on the field using the Camptocamp mobile application.

Licence

General

activities

frequentation: quiet

condition_rating: excellent

quality: great

Download track as

Location

heights

elevation min/max : 490 m / 914 m

elevation_access: 490 m

height_diff: +960 m / -960 m

length_total: 11.615 km

Access

access_condition: snowy

snow

elevation_up_snow: 490 m

elevation_down_snow: 490 m

snow_quantity: excellent

snow_quality: excellent

participants

participant_count: 5

Mathieu des Noes, Clém, Club Montagne AS CEA/ST Grenoble

route_description

Montée au Takeyama par la crête SW, puis tricotages dans la combe W.

weather and conditions


Brouillard mais pas de neige ni de vent.


20 à 40 cm de poudre sur tout l'itinéraire. Ski excellent.

timing

10h30-16h40

access_comment

4x4 obligatoire. Se renseigner à la ferme pour savoir oû garer sa voiture (pour ne pas gêner le déneigement en bout de route). Prévoir auparavant la traduction en japonais, les employés ne parlent pas anglais.

personal comments

Ca partait pour un belle et longue balade peu skiante. La vue sur la combe W a réveillé notre appétit de poudre. On a donc amorti la trace et fait du super ski. On a continué ensuite notre périple vers Noboribetsu, haut lieu des onsen de Sapporo. Une sorte de La Bourboule nippone, mais les onsen ne sont pas inouïs. Etape qu'on peut allègrement zapper.

Associated routes

Associated articles

Associated xreports

Comments

No thread yet?

Log in to post the first comment

No thread yet?

Log in to post the first comment

{{::post['created_at'] | amUtc | amLocal | amTimeAgo}}
  • ca
  • de
  • it
  • en
  • es
  • eu